Clear Path Utility Solutions, LLC.
Successful ClearPath Utility Solutions Projects
- Click on a project below to learn more:
- 24 Inch and 12 Inch Steel. I-70 crossing
- 780' Grade/Rock Bore placing 36 Inch HDPE
- 1000’ Rock Project in Morgantown, WV
- 28,400 feet of 12” DIPS SDR 11 HDPE Pipe in Corning, OH
- 735’ River Crossing in Lucasville, OH
- 555' Project in Parkersburg, WV
- 600' Rock Project
- 675' Rock Project in South Zanesville, OH
- 735' Rock Project in South Zanesville, OH
- 2114' project under Chester River in Maryland
- 320' of 24" steel in Cleveland
- 5000' of 10" Rock Drilling
- 400' River/Rock Project in Darlington, OH
- See more on and become a fan.
Vermeer 220x300 & R9x12T Reclaimer
Directional Drilling Services
780' of 36 inch HDPE
With the addition of a Vermeer 220x300, ClearPath completed a 780' Grade bore through solid rock. Wire line services were used to guide the pilot bore and maintain the grade. A 48 Inch hole opener was pulled on the final pass to allow for placement of the 36 inch HDPE. Upon completion of the 36 inch product placement, a 24 inch HDPE product was placed inside the 36 inch HDPE. The project will allow for one containment pond to drain to a new secondary containment pond.