Clear Path Utility Solutions, LLC.
Successful ClearPath Utility Solutions Projects
- Click on a project below to learn more:
- 24 Inch and 12 Inch Steel. I-70 crossing
- 780' Grade/Rock Bore placing 36 Inch HDPE
- 1000’ Rock Project in Morgantown, WV
- 28,400 feet of 12” DIPS SDR 11 HDPE Pipe in Corning, OH
- 735’ River Crossing in Lucasville, OH
- 555' Project in Parkersburg, WV
- 600' Rock Project
- 675' Rock Project in South Zanesville, OH
- 735' Rock Project in South Zanesville, OH
- 2114' project under Chester River in Maryland
- 320' of 24" steel in Cleveland
- 5000' of 10" Rock Drilling
- 400' River/Rock Project in Darlington, OH
- See more on and become a fan.
Product placement complete
Directional Drilling Services
555' Bore in Parkersburg, WV
Single digit temperatures and heavy rain provided challenging conditions for a sanitary sewer bore in Parkersburg, WV. The project originated on the berm of a railroad track and then proceeded directly under a spur. The steel rails of the track proved to offer little interference for the DigiTrak Eclipse locating system and the pilot bore was completed within a few hours.
The pipe pullback began on Christmas Eve and was completed in time to return home and enjoy the Christmas Eve Festivities.