Clear Path Utility Solutions, LLC.
Successful ClearPath Utility Solutions Projects
- Click on a project below to learn more:
- 24 Inch and 12 Inch Steel. I-70 crossing
- 780' Grade/Rock Bore placing 36 Inch HDPE
- 1000’ Rock Project in Morgantown, WV
- 28,400 feet of 12” DIPS SDR 11 HDPE Pipe in Corning, OH
- 735’ River Crossing in Lucasville, OH
- 555' Project in Parkersburg, WV
- 600' Rock Project
- 675' Rock Project in South Zanesville, OH
- 735' Rock Project in South Zanesville, OH
- 2114' project under Chester River in Maryland
- 320' of 24" steel in Cleveland
- 5000' of 10" Rock Drilling
- 400' River/Rock Project in Darlington, OH
- See more on and become a fan.
2,114' from entrance to exit pit
Directional Drilling Services
2114' bore under Chester River in Maryland
With the use of a Ditch With 70x20, Mr. Riley completed a 2,114 bore in Maryland. This bore crossed the Chester River which spanned 1,900' from edge of water to edge of water. The exit side of the bore was confined to a 10' strip of grass. A wetlands bordered one side with a Marina bordering the other side. Upon completion of the pilot bore, the exit was within 18 inches of the proposed exit. Wire Line services where provided by In-Rock.