Clear Path Utility Solutions, LLC.
Successful ClearPath Utility Solutions Projects
- Click on a project below to learn more:
- 24 Inch and 12 Inch Steel. I-70 crossing
- 780' Grade/Rock Bore placing 36 Inch HDPE
- 1000’ Rock Project in Morgantown, WV
- 28,400 feet of 12” DIPS SDR 11 HDPE Pipe in Corning, OH
- 735’ River Crossing in Lucasville, OH
- 555' Project in Parkersburg, WV
- 600' Rock Project
- 675' Rock Project in South Zanesville, OH
- 735' Rock Project in South Zanesville, OH
- 2114' project under Chester River in Maryland
- 320' of 24" steel in Cleveland
- 5000' of 10" Rock Drilling
- 400' River/Rock Project in Darlington, OH
- See more on and become a fan.
600' of 12" steel
Directional Drilling Services
600' Rock Bore. Placing 12" Steel.
Using Atlas Bore Planner, ClearPath successfully completes a 600' solid rock bore. This bore included some extreme obstacles with a stream crossing and a minimum depth requirement of 6' as the first obstacle to cross. Then a road crossing with an elevation increase of over 20' and a continued elevation change of 150' over the next 390'. ClearPath completed this bore within 8 business days, while another contractor required approximately 30 business days to complete the sister bore prior to our arrival.