Clear Path Utility Solutions, LLC.
Successful ClearPath Utility Solutions Projects
- Click on a project below to learn more:
- 24 Inch and 12 Inch Steel. I-70 crossing
- 780' Grade/Rock Bore placing 36 Inch HDPE
- 1000’ Rock Project in Morgantown, WV
- 28,400 feet of 12” DIPS SDR 11 HDPE Pipe in Corning, OH
- 735’ River Crossing in Lucasville, OH
- 555' Project in Parkersburg, WV
- 600' Rock Project
- 675' Rock Project in South Zanesville, OH
- 735' Rock Project in South Zanesville, OH
- 2114' project under Chester River in Maryland
- 320' of 24" steel in Cleveland
- 5000' of 10" Rock Drilling
- 400' River/Rock Project in Darlington, OH
- See more on and become a fan.
1000’ of 12” HDPE being placed on a 260’ bore with a Vermeer 20x22
Directional Drilling Services
Fusing of 28,000+ feet of 12” HDPE in Corning, OH
ClearPath Utility Solutions was hired to fuse approximately 28,400 feet of 12” DIPS SDR 11 HDPE Pipe in Corning, OH. A McElroy 618 Roller and a 618 TracStar were incorporated for the project. The 618 Roller provided for quicker mobilization for some of the remote tie-in’s, while the 618 TracStar provided faster setup and alignment times.
While on site, ClearPath completed 11 bores ranging from 60’ to 260’ placing the 12” HDPE with 2 of the bores requiring 20” HDPE casing. On one occasion a 1,000’ section of the 12” HDPE was pulled through a 260’ bore utilizing a Vermeer 20x22.