Clear Path Utility Solutions, LLC.
Successful ClearPath Utility Solutions Projects
- Click on a project below to learn more:
- 24 Inch and 12 Inch Steel. I-70 crossing
- 780' Grade/Rock Bore placing 36 Inch HDPE
- 1000’ Rock Project in Morgantown, WV
- 28,400 feet of 12” DIPS SDR 11 HDPE Pipe in Corning, OH
- 735’ River Crossing in Lucasville, OH
- 555' Project in Parkersburg, WV
- 600' Rock Project
- 675' Rock Project in South Zanesville, OH
- 735' Rock Project in South Zanesville, OH
- 2114' project under Chester River in Maryland
- 320' of 24" steel in Cleveland
- 5000' of 10" Rock Drilling
- 400' River/Rock Project in Darlington, OH
- See more on and become a fan.
Rock wall along SR 800
Directional Drilling Services
5000' of 6" Rock Drilling
With the use of a Vermeer 24x40 Series II, Vermeer 20x22 Series II and Astec HDD50 Air Hammer, ClearPath completes approximately 5000' of 10" rock drilling and placement of 6" product in Woodsfield, Ohio.
This project commenced just north of Woodsfield, OH and ran along side of SR 800. Though the difficult 2010 winter caused some delays due to traffic concerns, the low temps also proved to be a challege with the utilization of the high pressure air compressor. ClearPath's customer was provided with some time extensions due to the weather, however a "Drop Dead" completion date was looming. ClearPath utilized the Vermeer 24x40 to complete the pilot bores and brought in the Vermeer 20x22 to upsize the hole to 10" and place the product. With the addition of the second rig, ClearPath was able to complete the project on time.